Reactor Sampling – 24 Hours Continuous Sampling With The Automatic Sampling Unit (ASU)

Reactor sampling 24 hours a day

Reactor Sampling (and then diluting/quenching) at exact definedHEL Automated Screening Unit for reactor sampling, 24 hours a day times both day and night are now possible with a compact
(~ 25 (l) x 27.1 (h) x 17.5 (w) cm) portable Automated Sampling Unit (ASU), on both small and large reactors.
A recent design change has enabled the cost to be reduced without any compromise in features:
| No cross-contamination between samples
| Wetted parts PTFE/glass
| Consumable costs virtually zero
| Essentially no preparation and setup time

more info